Friday, November 30, 2012

365/335 Bath fix

The girl’s bath shower walls were leaking. The plastic tiles were not holding anymore. Hubby tore them out the week of Thanksgiving. With the craziness of the holiday, a “mancation”, work and helping a friend, he is just now getting back to it.

The new surround we picked up is better suited for a single faucet so he needs to re-plumb it. Tonight he installed the shut offs and then it was time to put the girls to bed… it will get done a little at a time.

11302012

Related Posts with Thumbnails